Release process checklist template

From code freeze to 100% rollout: the go/no-go gate, canary checks, rollback path and a checklist for every phase.

Use this templateFree, opens in your browser. No sign-up.

Release process checklist template
Before code freeze
Go / no-go checks
Release day
After release
Code freeze (Tue 12:00)
Cut release branch + RC1
Regression + smoke tests on staging
Go / no-go?
Fix on the branch, cut next RC
Canary: 5% of traffic for 1 h
Errors and p95 within SLO?
Roll back + open an incident
Roll out to 100%
Tag v2.14.0, publish notes
All release tickets merged and reviewed
Unfinished work behind flags (default off)
DB migrations backward compatible
Changelog drafted
No open P0 / P1 bugs
CI green on the release branch
Load test within 10% of baseline
On-call + rollback owner named
Announce in #releases
Deploy in business hours, never Friday
Watch dashboards for 60 min
Support briefed on what changed
Release notes published
Close tickets, update the roadmap
Remove stale flags within 2 sprints
Retro if anything went wrong
Release process
no-go
go
no
yes
The release process checklist template as it opens in Kelvo: 10 boxes, 2 decisions among them, 16 sticky notes and 10 links, in 4 sections.

What's on the board

Before code freeze
All release tickets merged and reviewed · Unfinished work behind flags (default off) · DB migrations backward compatible · Changelog drafted
Go / no-go checks
No open P0 / P1 bugs · CI green on the release branch · Load test within 10% of baseline · On-call + rollback owner named
Release day
Announce in #releases · Deploy in business hours, never Friday · Watch dashboards for 60 min · Support briefed on what changed
After release
Release notes published · Close tickets, update the roadmap · Remove stale flags within 2 sprints · Retro if anything went wrong

Also on the board

  • Fix on the branch, cut next RC
  • Roll back + open an incident
  • Code freeze (Tue 12:00)
  • Tag v2.14.0, publish notes
  • Errors and p95 within SLO?
  • Go / no-go?
  • Regression + smoke tests on staging
  • Cut release branch + RC1
  • Canary: 5% of traffic for 1 h
  • Roll out to 100%

How to use this template

  1. Click Use this template. It opens in the Kelvo app as a new board, saved in your browser.
  2. Double-click any box to change its text. Replace the examples with your own content.
  3. Paste a table. Paste comma- or tab-separated text and it becomes a table. Tab moves to the next cell and adds rows as you go.
  4. Paste code as code. Paste a snippet and it becomes a code block with syntax colouring; Tab indents inside it.
  5. Link by dragging. Hover a box and drag one of its dots onto another box. The whole box is the target, and links stay attached when you move things.

Good for

  • release
  • deployment
  • checklist
  • canary
  • engineer
  • Designing a schema or an API before writing it
  • Explaining a tricky flow in a code review or design doc
  • Agreeing on team conventions such as branching and reviews

Related templates

  • Code review checklist template previewCode review checklist

    What to look for in a pull request, from correctness to security, so reviews are fast and consistent.

  • ER diagram (database schema) template previewER diagram (database schema)

    Entities as tables with columns, types and keys, joined by one-to-many relationships — sketch a schema before the migration.

  • UML class diagram template previewUML class diagram

    Classes with fields and methods, associations with multiplicity, and an interface with two implementations.

  • State machine template previewState machine

    Every state an order can be in and the events that move it — the source of truth for status logic and tests.

  • Canary & blue/green deployment template previewCanary & blue/green deployment

    Release safely: shift a little traffic to the new version, check SLOs, then promote or roll back — plus a strategy comparison.

  • Feature launch checklist template previewFeature launch checklist

    Everything that has to happen before, on and after launch day, with an owner for each item.

All software engineering diagram templates · All templates

Use the release process checklist template