CI/CD pipeline with quality gates template
From pull request to production: build, tests, security scans, staging, approval and canary release, with the gates in between.
Use this templateFree, opens in your browser. No sign-up.
What's on the board
- Quality gates
- Coverage ≥ 80% on changed code · No critical or high CVEs · Staging error rate < 1% for 30 min · Release approved by the service owner
- Measure (DORA)
- Deployment frequency · Lead time for changes · Change failure rate · Time to restore service
Also on the board
- Push / pull request
- Tests pass?
- Lint, SAST, dependency + secret scan
- Build image, sign, push to registry
- Build + unit tests
- Fail: notify author, block merge
- Approve release?
- Monitor SLOs, auto-rollback on alert
- Deploy to production (canary)
- Deploy to staging (Helm / Argo CD)
- Integration + E2E tests
How to use this template
- Click Use this template. It opens in the Kelvo app as a new board, saved in your browser.
- Double-click any box to change its text. Replace the examples with your own content.
- Link by dragging. Hover a box and drag one of its dots onto another box. The whole box is the target, and links stay attached when you move things.
- Sketch, then convert. Draw boxes and arrows with the pen, select the strokes and click Convert sketch: they become real boxes and links.
- Group by environment or region. Draw a frame (F) around a group of services; moving the frame moves everything inside it.
Good for
- devops
- ci/cd
- pipeline
- deployment
- github actions
- Design reviews and architecture decision meetings
- Runbooks and onboarding for on-call engineers
- Planning a migration or a cost-cutting pass
Related templates
Canary & blue/green deployment
Release safely: shift a little traffic to the new version, check SLOs, then promote or roll back — plus a strategy comparison.
GitOps workflow (Argo CD)
Deploy by pull request: CI builds the image, a config-repo PR bumps the tag, and Argo CD syncs the cluster to match git.
Kubernetes cluster overview
Ingress, services, deployments and pods in a namespace, with config, storage, control plane and add-ons around them.
Observability stack
Metrics, logs and traces through OpenTelemetry into Prometheus, Loki and Tempo, with Grafana, alerting and SLO notes.
Release process checklist
From code freeze to 100% rollout: the go/no-go gate, canary checks, rollback path and a checklist for every phase.
Sales pipeline
Deals moving from lead to closed-won, one column per stage, with exit criteria for each stage.